Scaffolding hire, Harrogate

Up on the day. Checked every week.

Roofer booked and still no scaffold? Ledgerline puts up scaffolds for homes, roofers and small builders across Harrogate and Nidderdale: one free visit, then a written price, and a scaffold that is tagged and inspected until it comes down.

A finished Ledgerline tube and fitting scaffold two lifts high across the honey-grey stone front of a Victorian terrace in Harrogate, every lift boarded with guard rails and toe boards and a ladder up to each
  • 1,860

    Scaffolds put up since 2012

  • 14 years

    Putting up scaffolds in Harrogate

  • 4 gangs

    All employed, never subcontracted

  • 10 days

    Most domestic scaffolds are up in 10 working days or less, once the price is accepted

A roof job, the usual way

Five weeks of “scaffold?”

The roofer was booked. The scaffold came late, stood on the pavement with no licence, went unchecked after a gale and kept charging after the roof was done. All of it went on the kitchen calendar.

October Example calendar
  1. Roofer booked! Starts Mon 12th

  2. Scaffold? Rang, no answer

    scaffold??

  3. Roofer here 7.30. No scaffold

    Scaffold up, on the pavement. Licence??

  4. Ladder left up all night again

    Gale!

  5. Nobody's checked it since the gale

    Roof done. Still paying

The same job with Ledgerline

One price, up in a day, checked every week

The job from the calendar, on our record: the price in writing before anything moves, the scaffold up in a day, and a written check every week and after the gale.

Inspection record

A stone terrace in Harrogate

Example record
  • £650

    from, for the first four weeks

    For a house front, then £45 a week. VAT, design, putting it up, the inspections and taking it down are all in it.

  • 1 day

    to put it up

    A typical two-storey terrace front goes up in a day, by one gang of our own.

  • 7 days

    at most between checks

    Each check written up and the tag signed, with another after high winds, heavy rain or snow.

  1. Week 1 On the calendar: Scaffold? Rang, no answer On our record: The visit, then the price in writing. Pavement licence applied for
  2. Week 3 On the calendar: Licence?? On our record: Pavement licence granted; its conditions on the drawing
  3. Week 3 On the calendar: Roofer here 7.30. No scaffold On our record: Up in a day, before the roofer starts. Handover certificate given Safe to use
  4. Every evening On the calendar: Ladder left up all night again On our record: Ladder guard fitted at the end of the working day
  5. Week 4 On the calendar: Nobody's checked it since the gale On our record: After the gale: checked and written up before anyone went up Safe to use
  6. Week 5 on On the calendar: Roof done. Still paying On our record: £45 a week until the day it comes down; one call books that day

What we put up

Scaffolds for every wall,
roof and stack

Get a weekly price
  • House fronts

    Full height across a terrace or semi, for windows, render, pointing or gutters.

    Ends The roofer booked for Monday, and no way up.

    From £650 for up to 4 weeks then £45 a week

    Price a house front
  • Chimney stacks

    A boarded working platform right round the stack, with guard rails, reached from the scaffold below.

    Ends A ladder left against the house all night.

    From £495 for up to 4 weeks then £40 a week

    Price a chimney
  • Gable ends

    Side walls and tall gables, stepped to the slope of the ground and the line of the roof.

    Ends A gale, and nobody back to check it.

    From £720 for up to 4 weeks then £50 a week

    Price a gable
  • Extensions and house wraps

    Wrap scaffolds for extensions and whole houses; a loading bay for blocks and tiles from £320.

    Ends A scaffold on the pavement and no licence.

    From £1,650 for up to 4 weeks then £95 a week

    Price an extension
  • Temporary roofs

    A sheeted roof over an extension or a loft conversion, designed for the span and the wind.

    Ends A loft open to the rain, and no end to the bill.

    From £2,400 for up to 6 weeks designed to suit

    Price a temporary roof
  • Edge protection

    Guard rails, toe boards and brick guards along the eaves, so a roofer can work the whole slope.

    Ends A roofer at the gutter with nothing to stop a fall.

    From £560 for up to 4 weeks then £40 a week

    Price edge protection

Every price includes VAT, the design, putting it up, the inspections and taking it down. A council licence is the council's fee, passed on at cost and shown on its own line.

How a hire runs

From one site visit to the day it comes down

Five steps, each with what we do and the one thing we need from you.

Galvanised scaffold tubes sorted by length on steel racks against a sandstone wall in the Ledgerline yard, with stacks of banded scaffold boards, bags of couplers and a row of base plates beside them
  1. We come and measure

    A free visit, on a day that suits you

    We look at the walls, the roof, the ground and the pavement, and hear what your builder or roofer needs to reach. If the scaffold has to stand next door, we will meet your neighbour too.

    You: Tell us what the work is, and get your neighbour's agreement if we need their side.

  2. A drawing and a price in writing

    The written price within 2 working days of the visit

    One price for the first four weeks, or up to six for a temporary roof, and the rate after that, with the scaffold drawn to TG20:21. A licence fee or a bespoke design shows on its own line.

    You: Say yes, and pick the week your roofer or builder starts.

  3. The licence and the date

    Most domestic scaffolds go up in 10 working days or less from the price being accepted

    A scaffold on the pavement waits on a licence from North Yorkshire Council. We apply about two weeks ahead and build to its conditions.

    You: Nothing. We tell you the day the lorry comes.

  4. Up, tagged and handed over

    A typical two-storey terrace front: 1 day

    You get the handover certificate naming what the scaffold is for, its loading class and who may alter it, and a tag signed at the ladder.

    You: Let your trades on. If they need a change, they ring us.

  5. Looked after, then taken down

    After four weeks (six for a temporary roof), the rate on your price runs until it comes down

    The tag is signed again at every inspection and the ladder guard goes on every evening. When the work is done, we agree the day it comes down.

    You: Ring us when it can come down.

Why Ledgerline

Built to the drawing,
then looked after weekly

No deposit

on a house scaffold. Only a temporary roof asks for a third when it is booked, and the rest on completion.

Drawn to TG20:21

Every standard scaffold has its compliance sheet; anything bigger, like a temporary roof, goes to a scaffold designer first.

The pavement taken care of

We apply to North Yorkshire Council for the licence, light the corners at night and keep a clear walkway round the standards.

Locked off every evening

Ladder guards go on when the trades leave, and a wireless alarm can watch the lifts at night for £25 a week.

A galvanised right-angle coupler tightened where a horizontal ledger meets an upright standard on a Ledgerline scaffold against a stone wall

From homes and builders

What the neighbours said

Example review

Up on the Monday as promised, so the roofer started on the Tuesday. Down again on the day we agreed, with the gravel raked flat.

Came in with
A roofer booked and no scaffold
Went home with
Up the day before he started
Gemma R. Terrace front and roof, Bilton

A free visit, then the price in writing.

Book a site visit

Example review

Our stack is three storeys up, on a street full of children. They built a proper platform round it, and the ladder guard went on at the end of every working day.

Came in with
A ladder up against the house at night
Went home with
A guard on it every evening
Leon and Asha P. Chimney rebuild, Harlow Hill

Example review

The roof ran three weeks over. The weekly rate was on the written price from the start, and it stopped when the scaffold came down. No surprises on the last bill.

Came in with
A roof job running over
Went home with
A last bill he expected
Martin H. House front and roof, Pannal

Example review

I run a small building firm. They sort the licence, adapt the lifts when we ask, and I have never waited a day for a tag.

Came in with
Licences and changes to chase
Went home with
Both sorted for her
Claire D. Builder, Knaresborough

Example review

A gable end on a slope with a greenhouse in the way. They came back after a storm to check it before the renderers went up.

Came in with
A gale before the render
Went home with
A check before anyone went up
Steve W. Gable end, Killinghall

Advice

Read this before the tubes go up

Ask about your job
A scaffold tag in its holder, cable-tied to a standard at the foot of the ladder, its green insert showing and the ladder guard on

5 Nov 2026

What the tag on your scaffold is telling you

Safe to use, or do not use: how to read the card at the ladder, and when to ring us.

A scaffold on a Harrogate pavement with a covered walkway, padded standards and a lamp at each outside corner

22 Oct 2026

Scaffolding over the pavement: the licence explained

Why the council has to agree, what it asks for on site, and how long to allow.

A boarded platform built right round a tall stone chimney stack above a slate roof, guard rails on every side and a roof ladder up to it

8 Oct 2026

Getting up to a chimney stack, the safe way

Roof ladders, platforms and full scaffolds compared, and which one suits your stack.

Licences and questions

What people ask before the lorry arrives

Ask us on the site visit, or ring the office. The price comes to you in writing, so your builder or roofer reads the same price you do.

Ask us something
How long can I keep the scaffold up?

As long as the work takes. A house scaffold is priced for its first four weeks and a temporary roof for up to six; after that the rate on your price runs until the day it comes down. Ring us when the work is done and we agree that day with you.

Do I need a licence for the pavement?

Yes, if any part stands on the pavement or road. We apply to North Yorkshire Council about two weeks ahead, meet its conditions on site and pass the council's fee on at cost, shown on your price.

Who inspects it, and how often?

We do: before first use, then at least every seven days, and again after high winds, heavy rain or snow. Each check is written up, and the tag at the ladder is signed and dated.

Can my builder or roofer change it?

No. Only a scaffolder should move a board, a rail or a tie. Ring us and a gang will adapt it, and the tag is signed again before anyone goes back up.

Is it safe when nobody is working?

Ladder guards are fitted at the end of every working day. For an empty house or a tall job, a wireless alarm is available on request, at £25 a week.

What if it has to stand next door?

You will need your neighbour's agreement before we build on their side. We are happy to meet them on the site visit and show them where the standards will go.

Free site visit

Up on the day, and safe to use until it comes down.

Book the free site visit. Your written price follows within 2 working days of it, any pavement licence is applied for about two weeks ahead at the council's fee, and the tag at the ladder tells you the rest.

Demo form: it checks the fields and sends nothing.

We use your details only to reply to this enquiry. See our privacy notice.